Systagenix

Project Overview

 

This project involved many different elements. Careful consideration had to be given to the materials that would be used in the construction, as well as the mechanical and engineering systems.

 

The partition walls were cladded with white hygienic cladding and we installed specially clad doors with a large opening to allow for movement of materials in and out of the area. Column protection was put in place to protect damage to or from fork lift trucks.

 

We installed high speed roller shutter curtains, a bio guard ceiling and epoxy resin flooring. We also installed a temperature controlled air conditioning system.

 

Because of the nature of the clients work in wound care, it was very important that the correct materials were used and the systems were to a high quality. Due to our extensive experience we were able to manage the different elements of this project to ensure the finish was suitable for the needs of the client.